Frequently asked questions about extending a house or a building

Here are the questions owners ask us most often before extending. The answers remain general, because every plot and every building has its own limits, which only a visit can reveal.

Where should we start when we want to extend our house?

With a simple description of what you want to gain, a bedroom, a larger living room, a garage, an independent office. With this need, the existing drawings and a visit, we can say which solutions deserve to be studied and which ones run up against the plot or the structure.

Do all extensions require a building permit?

Almost all. Creating a volume, enclosing a terrace, altering a façade or making habitable a room that was not changes the building in the eyes of the authority. We prepare the building permit application file with a qualified representative, and the fees for this application are borne by the client. The site only starts after this permit has been issued.

Can you tell us in advance whether the permit will be granted?

No. The qualified representative checks what the zone and the plot allow and puts together a coherent file, but the decision rests with the cantonal authority, after consulting the departments concerned and, depending on the case, the municipality.

Why is a civil engineer necessary?

Because an extension brings new loads to the ground and almost always opens onto the house through a load-bearing wall. The appointed civil engineer calculates the foundations, slabs, beams and temporary propping. We build according to those drawings.

Is it preferable to extend in masonry or in timber frame?

Both have their merits. Masonry suits heavy volumes, basements and junctions with a solid house. Timber frame, built by a partner carpenter, is light and goes up quickly on site once prepared in the workshop. The ground, the access and the desired appearance guide the choice.

My house is semi-detached, can I extend it?

Often yes, towards the garden or on the open side, but the party wall, the views and the distances to the neighbour frame the project. It is useful to discuss it with the neighbour early on, because the permit application is made known to the neighbourhood.

And in a condominium or an apartment building?

Extending a unit affects common parts such as the façade, the roof or the grounds. A decision of the owners’ meeting is therefore needed under the condominium rules, and the administrator or property manager is involved from the start.

How is the new part connected to the existing house?

By a joint between the two structures, which do not behave in the same way, and by one or more openings in the existing wall. Floor levels, insulation and waterproofing at the junction are studied before the works so that the passage from one part to the other goes unnoticed.

Are the heating and electricity of the house sufficient for the added area?

This is checked case by case. Our heating and electrical partners verify the available power, the distribution board and the pipe routes, then propose an extension of the installation or an independent appliance for the new volume.

What is the right season for an extension?

Earthworks and concrete go more smoothly outside periods of frost and heavy rain. Once the volume is weathertight and closed, interior works continue in any season. We do not promise a date before having the permit and the construction drawings.

Will the garden be damaged by the works?

Machines passing and materials being stored always mark the ground. We define a site area and an access path with you, we protect the trees to be kept, and the reinstatement of the surroundings is included in the quote.

What does your quote contain?

An item-by-item description, from earthworks to painting, indicating what our team carries out and what the partner companies carry out. It is drawn up after the visit and does not commit you. If the engineer’s study later changes a structural item, we update the corresponding lines and explain the change to you.