A business that is doing well soon runs out of room. The shop can be enlarged by taking over the neighbouring unit, by opening onto the stock room or the back room, or by extending into the courtyard of the building. Entreprise du Bâtiment MS SA carries out these works in Geneva for shopkeepers, restaurant owners and landlords.
Joining two units almost always means cutting through a load-bearing wall on the ground floor of a building several storeys high. Nothing is done without the study of an appointed civil engineer, without the owner’s agreement and without a building permit.
What we carry out
Our team carries out the demolition, the openings, the masonry and the finishes. The shop front, the ventilation, the electricity, the plumbing and the steel support elements are carried out by our partner companies, which we coordinate.
- Opening of a wall between two neighbouring shops
- Integration of the back room into the sales area
- Ground-floor extension into the courtyard
- Removal of old fittings and false ceilings
- Levelling of the floors between the two units
- Partitions, ceilings and coatings
- Tiling, parquet and painting
How we work
We visit both units and, if possible, the cellar below, because the loads travel down to the foundations. The appointed civil engineer defines the support frame or beam, the propping and the order of operations.
For a business that stays open, we work in phases behind a temporary dust-tight partition. Noisy operations are grouped at the hours agreed with you and with the property manager. The final opening between the two areas is made when the new side is ready to receive customers.
Specific features in Geneva
We prepare the building permit application file with a qualified representative, and the fees for this application are borne by the client. The file also deals with fire safety, exits and accessibility, points examined by the departments concerned according to the activity carried on.
In town, deliveries and rubble removal take place from the street. A skip or a deposit on the pavement requires permission to occupy the public domain, to be requested in advance. The residents of the upper floors are informed by the property manager of the days when the wall is cut.
What helps us prepare your quote
- The drawings of both units and, if possible, of the building
- The activity carried on and the opening hours
- The contact details of the property manager or the owner
- Photos of the wall to be opened, from both sides
- The period during which the business can close or not
- The fittings planned by your shopfitter
Frequently asked questions
Who must give their agreement to join two shops?
The owner of the building, or both owners if the units do not belong to the same person, through the property manager. The leases are adapted accordingly, outside our involvement.
Can the business stay open during the works?
Often yes, thanks to phasing and temporary partitions. On the day the load-bearing wall is cut and the support is fitted, however, a closure is to be expected.
Can the shop front be altered at the same time?
Yes, this is even frequent. The new shop front, fitted by a partner, appears in the permit application because it changes the façade.
What happens if the floors of the two units are not at the same level?
We make up the difference with a screed, a gentle slope or a step depending on the height, taking into account the accessibility required for premises open to the public.